Informational Video on How to Upload Revised Documents to an Existing Street Use Application
This video explains how to provide additional or revised documents for an existing Street Use or Urban Forestry application with a status of Awaiting Corrections, Awaiting Documents, or Additional Information Required. It covers:
- How to determine what documents are required
- How to locate and download a Corrections sheet if one has been provided by your reviewer
- How to upload revisions when they are ready
- How to ensure your uploaded documents are matched to the document types expected so your next review cycle is triggered
For this demonstration, we use a Right-of-Way (ROW) Construction application that has been reviewed and is in Awaiting Corrections status. The steps are the same if your application is in Awaiting Documents or Additional Information Required status. This video begins with an existing application that is waiting for corrections to be submitted.
These steps are also explained in our application help articles:
- How to Respond to Street Use Corrections
- How to Respond to Additional Information Requests from Street Use
- How to Provide Documents to Begin the Next Phase Review for Your Street Improvement Permit